The bottom two treads of the stairs were replaced and the railing was installed.

The doors over the access panels to the heater/humidifier and electrical/cable panels were installed.

(No, that carpet piece is not purple - it's a dark red - and will be our family room "area rug" for now.)The bedroom window is framed out.

The doors have all received their final coat of paint.

I *think* all that's left now is to put another coat or two of paint on the stairway trim and railing, finish the sheetrock and paint on the outside of the bottom two steps, and carpet the stairs.
Then, of course, furnishing it, but how soon that goes will depend on where we end up with the budget.
No comments:
Post a Comment